CONFIGURATION CONTROL

CHECKLIST
Have configuration control procedures been tailored to product complexity?
Are configuration control requirements flowed down to all subcontractors?
Does the status accounting system allow for information feedback from the field?
Have functional and physical configuration audits been conducted?
Has a quality assurance change verification system been established?
Are technically qualified personnel involved in configuration management?
Has full authority been delegated by the project manager?