CHECKLIST
Has continuous
design analysis throughout the design process been specified?
Do the
contractor's corporate standards identify design analysis as an integral part
of the design process?
Are
design engineers required to participate in and use the results of design
analyses?
Has
proper balance been achieved between design analysis and testing?