INTEGRATED TEST
Overview
During the development of a weapon system a large number of tests are conducted by subcontractors, the price contractor, and the government. To assure that these tests are properly time phased, that adequate resources (e.g., test articles, test facilities, funding, manpower) are available, and that duplicative or redundant testing is eliminated, a properly integrated test program is required. Previous efforts at test program integration have resulted in top level documents which did not adequately address the entire test program. Such efforts have not produced viable management documents which actually control the total test program.

TRAPS
Test and Evaluation Master Plan (TEMP) is prepared using DoD Directive 5000.3 guidelines

Developmental testing is independently performed by contractor

Test program is planned to support major milestone reviews

Individual test plans are submitted for government approval

TEST
INTEGRATED
TEST
UNIFORM
TEST
REPORT
DESIGN
LIMIT
TAAF
FAILURE REPORTING SYSTEM
SOFTWARE
TEST
LIFE
FIELD
FEEDBACK