CHECKLIST
Has engineering
scheduled design releases with manufacturing and purchasing?
Has technical
risk been judged to be acceptable prior to design release?
Does
the management system control pre-released drawings?
Have
critical drawings been identified?
Is the
release of critical drawings properly scheduled to meet requirements?
Does
the design release process require concurrent review by all disciplines?