CHECKLIST
Is an
internal manufacturing qualification plan documented?
Are manufacturing
processes qualified at the prime contractor and major subcontractors?
What
positive assurance is there that critical long lead material will be available
when needed?
Have
manufacturing processes/procedures used in the fabrication of FSD hardware
been qualified to the maximum degree practicable?
Does
configuration control ensure both hardware and manufacturing process control?
Does
a "hands on" personnel training program exist?
Is there
a work force stability?
Is a
single shift, five-day workweek operation planned, particularly for Low Rate
Initial Production (LRIP)?
Did
the PRR indicate a stable design and manufacturing process?
What
is the contractor's place for implementing new technology?