QUALIFY MANUFACTURING PROCESS

CHECKLIST
Is an internal manufacturing qualification plan documented?
Are manufacturing processes qualified at the prime contractor and major subcontractors?
What positive assurance is there that critical long lead material will be available when needed?
Have manufacturing processes/procedures used in the fabrication of FSD hardware been qualified to the maximum degree practicable?
Does configuration control ensure both hardware and manufacturing process control?
Does a "hands on" personnel training program exist?
Is there a work force stability?
Is a single shift, five-day workweek operation planned, particularly for Low Rate Initial Production (LRIP)?
Did the PRR indicate a stable design and manufacturing process?
What is the contractor's place for implementing new technology?